Small borehole drilling for groundwater monitoring

The HCMR group drilled a small borehole (diameter of 6 cm and depth of 3 m), in the periphery of Shinias wetland to monitor the groundwater-wetland interactions, on a monthly basis. The water level and isotopic monitoring will start on January 2023 under the IAEA F33027 project and will last until spring 2024.